In this section
Grayton have taken the best practice from 25 years’ experience to remove outdated and obsolete work practices to deliver modern bespoke solutions.
Using 3D technology to generate models, pipe work can be designed and fabricated to precise tolerances which reduces shutdowns and maintenance breaks. These increased efficiencies are delivered to our clients in the knowledge our quality output provides the highest standards of design and supply. Quality assurance packs and certification provided at commissioning are based on our relentless drive for quality and precision.
- Surveying
- Engineering Design
- Fabrication
- Site Installation
- Commissioning
- Turnkey Solutions
- CDM Capabilities
“Grayton worked tirelessly, professionally and were fully committed to completing the task in a safe and timely manner.”‐ Paul Cobb - Improvement Engineer (British Steel)
“We devised a solution for British Steel to significantly reduce and simplify the connection to their DLCO gas holder, removing all redundant isolation valves, platforms and piped services. We manufactured and installed a new 10m piped spool with seal pot and pipework. Due to the volatile nature of the residue inside the gas main, we had to cold cut and water jet clean the gas main - which allowed hot work operations to commence and the removal of contents for lifting operations.”‐ British Steel